Cuddy GroupCuddy Group
Cuddy Group Multi-Disciplined Contractor 01792 321110

Latest News Latest News
This text is replaced by the Flash movie.

Controlled Collapse

Controlled CollapseYears of experience backed by expert calculations resulted in the successful controlled collapse of the 800 tonnes Dry Fines Plant illustrated below.

After examining the structural drawings and carrying out a survey, specific members were marked for pre-weakening. The structural engineers calculations confirmed that the remaining structure would remain stable before the members were cut in the planned sequence.

From a safe distance the support legs were pulled out to bring about a controlled collapse.

The twisted metal was then processed for commercial disposal using both oxy-propane cutting equipment and excavator mounted hydraulic rotating shears.

 
Head Office: Tank Farm Road, Llandarcy, Neath, SA10 6EN +44 (0)1792 321110

cuddy-group.co.uk